Photo Album: New foundation poured for a new angle cellar door in Coatesville, PA
This home in Coatesville needed their old cellar door replaced and concrete work on their foundation, so they contacted Steelway. We sent out one of our sales representatives to go out and assess the foundation and take measurements to manufacture a new custom cellar door in our King of Prussia plant. While the angle cellar door wa being fabricated, our concrete crew went out, removed the old cellar door, demolished the foundation, set the forms, and poured the new concrete foundation. After the concrete had time to dry, one of our installation crews went out, removed the forms, and installed the custom angle cellar door. Perfect foundation makes for a perfect fit of the custom cellar door!
Top of foundation
This foundation needs to be demolished and repoured
Front of foundation
Cracks in the front of the foundation
Angle Cellar Door on new foundation
Perfect fit!
Left side Wall
Part of the foundation wall that needs to be replaced
Right side of Wall
The other side of the foundation wall that needs to be replaced
Fresh Concrete
After the forms were set, the concrete was poured.